Sep 21, 2026 · 3 min
Why we wait 42 days
Between the cut and your bathroom, every bar spends six weeks on a rack. Here is what happens in that time.

01Day 0: the cut
The slab has rested 48 h in its cedar mould. Karim wire-cuts it into twelve bars, lays them on the rack and writes down the batch number.
02Weeks 1 to 3
The water evaporates and saponification finishes. The bar loses up to 10% of its weight. Every week, it is turned so it dries on all sides.
03Weeks 4 to 6
The bar hardens and settles. Its lather becomes finer and creamier. It is ready when it stops losing weight.
04Day 42
The batch leaves the cure, is labelled with its cut and release dates, then goes to the shop. Not one day less.





